Starter overhaul (civvy starter)

Topics relating to the starting, charging, lighting, or suppression system.

Starter overhaul (civvy starter)

Postby pfarber » Thu May 08, 2014 8:07 pm

This is the starter that was bolted up to the 58 235. Its similar to the military one... but since this is not on original motor I didn't delve into it to far.. just wanted to freshen up the thing.

Typical 50's era starter. In good shape, just a bit weathered.
rs_DSCN0345.jpg
rs_DSCN0345.jpg (127.07 KiB) Viewed 32933 times


Taken apart.. only three bolts held everything together. Quite easy to break down.
rs_DSCN0349.jpg
rs_DSCN0349.jpg (144.39 KiB) Viewed 32933 times


Brushes take out so I can clean/paint it. Two brushes connected to the field coils, two to the frame.
rs_DSCN0355.jpg
rs_DSCN0355.jpg (168.28 KiB) Viewed 32933 times


Body taped up. Since the coils were still in it (I didn't want to unsolder anything) this was required. Black Gorilla tape is essential for masking parts to be sandblasted.
rs_DSCN0361.jpg
rs_DSCN0361.jpg (142.18 KiB) Viewed 32933 times


All the parts blasted. I just held the base in my hand.
rs_DSCN0362.jpg
rs_DSCN0362.jpg (159.5 KiB) Viewed 32933 times


I decided to paint the cast iron ends Rustoleum Aluminum. Its a bit shiny, but gives it a nice look. I will be using this paint on the T-2 fuel filter bowl... it really looks like cad plating.
rs_DSCN0363.jpg
rs_DSCN0363.jpg (144.57 KiB) Viewed 32933 times


Body got Rustoelum Gloss Black (kinda close to the black lacquer used originally. The inside of the body was VERY glossy).
rs_DSCN0364.jpg
rs_DSCN0364.jpg (154.81 KiB) Viewed 32933 times


The only maintenance required was to clean the commutator.
rs_DSCN0366.jpg
rs_DSCN0366.jpg (153.38 KiB) Viewed 32933 times


After being cleaned off with the stones I have
rs_DSCN0367.jpg
rs_DSCN0367.jpg (149.29 KiB) Viewed 32933 times


Then back into the base. It was easier to put the brushed in, then place the rotor this way. All I had to do was pull back on the brushes and let them catch the commutator, then do the other two. Fell right into place.
rs_DSCN0368.jpg
rs_DSCN0368.jpg (155.32 KiB) Viewed 32933 times


New switch, installed on the bell housing. Waiting for the paint to dry was the longest part. I started when the temp was to cool and paid for it simply waiting for it to dry.
rs_DSCN0370.jpg
rs_DSCN0370.jpg (153.48 KiB) Viewed 32933 times
I got a Mountain Cur and a ~~pitbull~~ big loveable cuddle puppy
RIP Kimber 5/26/2022
RIP Yeager 1/3/2019
RIP TJ 3/25/2014
RIP Sugar Bear 8/29/2014
RIP Shilo 4/10/2015
RIP Yuki 2/19/2017
User avatar
pfarber
Motor Sergeant
 
Posts: 2839
Joined: Wed Oct 10, 2007 2:45 am
Location: The Internet

Return to Electrical